Not only a comparison site: we help shortlist suitable UAE free zones and request a suitable current market quote for your activity, visa count and budget - with no service charge from UAE Freezone Compare. Request a free quote
Comparing:
Compare Now

Hamriyah Free Zone (HFZA) Guide 2025: Heavy Industry and Marine Hub

Hamriyah Free Zone (HFZA) Guide 2025: Heavy Industry and Marine Hub — Quick Facts 2026

Starting CostQuote-based
Price ConfidenceHigh-confidence public consensus
Source TypePublic consultant sources; official FAQ may block automated fetches
Last ReviewedJune 2026
EmirateUAE
Best ForMulti-sector
Visa OptionsFlexible packages
Setup TimePackage and activity dependent
Key ActivitiesSee full activity list

Final pricing may vary by activity, visa count, office requirement, shareholder structure and authority updates. See our pricing methodology.

About This Page

Written by: UAE Freezone Compare Editorial Team  |  Last reviewed: August 2026  |  Data sources: Pricing Methodology

Pricing uses available authority material, public package data and internally reviewed evidence; quote-based rows require current confirmation. Referral relationships may support quote fulfilment, but they do not control editorial rankings. Read our partner disclosure.

📅 Last reviewed: August 4, 2026📋 By: UAE Freezone Compare Editorial TeamFact-checked by UAE Freezone Compare Editorial Team

Hamriyah Free Zone (HFZA) in Sharjah is the UAE’s leading hub for heavy industry, marine services, oil and gas, and large-scale manufacturing. Here is the complete 2025 guide.

What is Hamriyah Free Zone?

Hamriyah Free Zone Authority (HFZA) was established in 1995 in the northern Sharjah coast, adjacent to Hamriyah Port. HFZA covers 26 million sqm and is home to 6,500+ companies from 160+ countries. Hamriyah Port: a deep-water port handling dry bulk, liquid bulk, containers, and RoRo (roll-on/roll-off) cargo. The port’s deep draft makes it suitable for large vessels. HFZA key industries: oil and gas services, petrochemicals, heavy machinery, marine equipment, construction materials, steel fabrication, and ship repair.

HFZA Facility Types

HFZA offers a range of facility options beyond standard offices: Industrial plots (5,000-100,000+ sqm): for large-scale manufacturing and fabrication. Land lease periods: 5-25 years. Standard factory units (250-2,500 sqm): for light to medium manufacturing. Warehouses (500-5,000 sqm): for storage and logistics. Open storage yards: for large equipment, pipes, and bulk materials. Offshore facilities: dedicated marine services area with sea access.

HFZA vs. JAFZA

Both HFZA and JAFZA are major UAE free zones with port access. Key differences: HFZA (Sharjah): 20-40% cheaper industrial land and facility costs than JAFZA. Better for heavy industry and large fabrication yards. JAFZA (Jebel Ali): significantly larger container port (one of the world’s top 10). Better for container trade and import/export of finished goods. For oil and gas fabrication, offshore marine equipment, and heavy manufacturing: HFZA offers a cost advantage. For commodity import/export through containers: JAFZA’s larger port infrastructure is superior.

Pricing Evidence & Source Notes

Use this profile as a planning guide, not a final invoice. Confirm the current package, activity wording, visas, office or flexi-desk requirement and renewal amount before payment.

Free Zone Package Year 1 Cost Renewal Cost 3-Year Total Visa Option Office / Flexi Requirement Year 1 Confidence Source Type Conflict Status Last Reviewed
Hamriyah Free Zone Basic licence public component AED 15,000-25,000 (licence from AED 8,000-15,000 + 1 visa AED 4,500 all-in; HFZA does not publish a single public price table)
Confidence: High-confidence public consensus
Quote-based renewal
Confidence: Needs confirmation
Quote-based 3-year total
Confidence: Needs confirmation
Depends on facility Warehouse, land, office or industrial facility High-confidence public consensus Public consultant sources; official FAQ may block automated fetches Current package / renewal confirmation required June 2026
What is includedPublic consultant sources consistently list an AED 11,000 starting licence component; final facility and authority quote must be confirmed.
What is not includedFacility, visas, utility costs, deposits and industrial approvals unless quoted.
Hidden-cost riskIndustrial approvals and facility needs can alter totals.
Banking difficultyMedium
Best fitIndustrial, manufacturing, trading and warehouse-led companies in Sharjah.

Source evidence: Review source | Methodology | Corrections.

Prices can change based on free zone authority updates, activity selection, visa count, office or flexi-desk requirement, shareholder structure, establishment card, immigration file, medical test, Emirates ID, insurance, banking support and consultant service fees. Last reviewed June 2026. Always request a current quote before payment. View methodology or compare all rows in the UAE Free Zone Cost Index.

Trademark and Logo Disclaimer: All free zone names, logos, brand marks, and trademarks displayed on this page are the property of their respective owners (the named free zone authorities) and are used here for identification and editorial comparison purposes only under fair use. UAE Freezone Compare is an independent comparison platform and is not affiliated with, endorsed by, or in any way officially connected to Hamriyah Free Zone (HFZA) Guide 2025: Heavy Industry and Marine Hub or its parent authority. Where an official logo is unavailable, an initials-based visual mark may be shown for identification. If you are the rights holder and wish to request the use, removal, or replacement of any logo, please contact us and we will respond promptly.

Pricing Evidence & Source Notes

Use this profile as a planning guide, not a final invoice. Confirm the current package, activity wording, visas, office or flexi-desk requirement and renewal amount before payment.

Free Zone Package Year 1 Cost Renewal Cost 3-Year Total Visa Option Office / Flexi Requirement Year 1 Confidence Source Type Conflict Status Last Reviewed
Hamriyah Free Zone Basic licence public component AED 15,000-25,000 (licence from AED 8,000-15,000 + 1 visa AED 4,500 all-in; HFZA does not publish a single public price table)
Confidence: High-confidence public consensus
Quote-based renewal
Confidence: Needs confirmation
Quote-based 3-year total
Confidence: Needs confirmation
Depends on facility Warehouse, land, office or industrial facility High-confidence public consensus Public consultant sources; official FAQ may block automated fetches Current package / renewal confirmation required June 2026
What is includedPublic consultant sources consistently list an AED 11,000 starting licence component; final facility and authority quote must be confirmed.
What is not includedFacility, visas, utility costs, deposits and industrial approvals unless quoted.
Hidden-cost riskIndustrial approvals and facility needs can alter totals.
Banking difficultyMedium
Best fitIndustrial, manufacturing, trading and warehouse-led companies in Sharjah.

Source evidence: Review source | Methodology | Corrections.

Prices can change based on free zone authority updates, activity selection, visa count, office or flexi-desk requirement, shareholder structure, establishment card, immigration file, medical test, Emirates ID, insurance, banking support and consultant service fees. Last reviewed June 2026. Always request a current quote before payment. View methodology or compare all rows in the UAE Free Zone Cost Index.

Calculate CostRequest Quote
Best Quote - Free